HM Civil Engineering can prepare grading and site plans with a one week turnaround. The design will optimise for cut and fill volumes and integrate drainage into the design. The drainage design can b designed to accommodate the desired storm event and provide attenuation if the peak drainage discharge rate needs to be limited.